So I’ve been slacking on the van build. I have a ton of reasons, which I’m recognizing have slipped into the excuses realm. I'm procrastinating in starting the work. Current excuses are: I need to do the floor before I do the rest. And I need special wood for the flooring (Baltic Birch, or at least marine grade plywood, neither available in my local big box home improvement stores). And I couldn’t shop for it because I was being mom (not true, just easier to shop when you don’t have a bored kid in tow). And then I couldn’t shop for it because I’m isolating again after a COVID exposure (testing indicates I beat that rap, but still it's a 14 day quarantine) Also, I need it to be 50+ degrees so I can rustoleum the minor rust under the floor, so I can’t progress even if I had the wood.

All of which is nonsense. There is no reason I can’t do the ceiling and walls and do the floor after. I’ve been not thinking about the walls because of the floor holdups and also my havelock wool insulation as not yet arrived (but it should in a week or two.)

But I’ve had the ceiling fan for 3+ weeks, and made no movement on installing it. In my head I had to wait for the insulation before I did the ceiling fan. Now I’m recognizing this is not even vaguely the case. In fact I want the fan in before the insulation so I can insulate around it. Duh. 

I’m getting a referral to a local guy to do my fan install. I haven’t actually talked to him yet, but I'm working the smalltown referral network. The network being what it is, I have high hopes to get moving on this. I recognized that this means moving at the speed of Delaware (which is slow), but I’m still optimistic that the fan will go in later this week. Or next.

A friend gifted me a big box 2 weeks ago of sound deadening material. I assumed it was all kilmat or dynamat or similar. Turns out when I opened it, it is indeed some kilmat type stuff called CLD Tiles but also Thinsulate, Mass Loaded Vinyl, and closed cell foam. So since it's here, I’m going to put in the CLD tiles and use the thinsulate on the ceiling. I’m going to forgo the MLV and CCF - its heavy and tedious. I probably don’t have enough Thinsulate to do the whole van, but no matter, my wool insulation is coming soon. And I’ll layer that on too. 

I got up this morning all ready to put start with the CLD tiles. I even dressed in my stain paint splattered work clothes. . . it’s 1:30 and I’ve yet to get started . . maybe after I get this posted. Motivation, she is a fickle fickle mistress <-- this is my current favorite excuse

One thing of positive progress I’ve made: I’ve been buying all the stuffs. Spray glue for the insulation, rustoleum paint, roller to install the CLD, ceiling planks, extra strong folding shelf brackets for a sometimes bed, magnets for the ceiling (yes, I am planning to hold up my ceiling with magnets just like this guy  : https://www.youtube.com/watch?v=kfuUC88SYx0 

So hopefully the schedule is:

  • Now: install the CLD tile; schedule the ceiling fan install, pick up ceiling planks
  • Next: get the ceiling fan installed, cut the thinsulate to size, install it on the ceiling
  • After: Put the ceiling planks on. Insulate the walls. Shop for floor wood. Rustoleum the floor. Etc. Etc.
MORE
1/9 '21 1 Comment
>>>"There is no reason I can’t do the ceiling and walls and do the floor after."

I'm sure you've got it figured out, and I know that it's possible, but my gut instinct falls in line with your original thought. I think I'm just picturing dealing with the 'overlap' from walls to floor.

>>>"...hold up my ceiling with magnets just like this guy..."

Okay - that's really cool. I've never seen that approach and I kinda love it. Also - magnets - how do they work?! :P